Project work consisted of Soil/Site Evaluation, Hydrologic Evaluation, and Site Loading Capacity for an Infiltration Basin Wastewater System. The design daily flow was 7,000 GPD.
Image source: Wikimedia Commons
Project work consisted of Soil/Site Evaluation, Hydrologic Evaluation, and Site Loading Capacity for an Infiltration Basin Wastewater System. The design daily flow was 7,000 GPD.
Image source: Wikimedia Commons